update:6/30 Started to do final mount up of the intercooler and radiator, I need to raise the intercooler about 1/2 inch to square it out with the grill I got lucky the factory upper rad hose and cover worked perfect, the lower havent tried yet looks like it will be a pain. Mocking the fan up for some brackets after that time to drill some holes in the core support for the intercooler pipe to carb hat
camaro Lookin good. I put the full GM serpentine belt assy on mine so I can run PS, a/c and all of that stuff. I hope it doesn't block my header routes. We'll see before long.
Started to mock up the temporary pipe from intercooler to carb hat and set the turbo in place for visual confirmation. Looks like I will need to move the turbo up about an inch or two, s.o.b is heavy and its tuff to move jockey around for position
Trying my best with limited tools for now till my garage is done, then some serious fabbing will be going on
I know how you feel. I'm sitting on my hands right now untill my garage is wired for my welder. Had the electrition out today to take a look. It will be done friday. Then watch the sparks start to fly lol.
is your right wheel going to clear making a tight left turn? i had my 2 inch wastegate pipe running tight to my frame and it would hit when i turned. its now cut off at the frame.